Guides
Reference pages on the GB grid, CfD rounds and network headroom, each built only from public data and our published method, with dated sources. No forecasts and no opinion.
- CfD allocation round results, AR1 to AR7
Every CfD round from AR1 to AR7: capacity awarded, projects and strike prices by technology, in each round's price base and 2024 prices.
Data as of 15 October 2026
- The GB grid connection queue: what the TEC register shows
NESO's TEC register summarised: 604.1 GW unbuilt, by status, technology, area, connection year and Gate 1 or Gate 2, beside NESO's reformed pipeline.
Data as of 16 October 2026
- Distribution network headroom by DNO
Substation headroom from all six GB distribution network operators: coverage, source dates, red-amber-green ratings, median headroom and licences.
Data as of 7 October 2026