CfD allocation round results, AR1 to AR7

Seven Contracts for Difference allocation rounds have awarded 50.0 GW across 569 projects. AR7 is the largest: 14.67 GW for 201 projects.

Data as of 15 October 2026. Built only from public data and our published method. Information only, not advice.

Every round at a glance

Capacity is as offered at auction in the DESNZ results. “Live” and “terminated” are contract statuses on the LCCC register: live means the contract's start date has passed, so a project can be generating before its contract is live. The register drops offers that were not signed and records later changes, so the two sources differ.

CfD allocation rounds: DESNZ results, with LCCC register status as of 19 October 2026
RoundFinal results publishedCapacity awarded (GW)ProjectsPrice baseCfD contract live (GW, LCCC status)Terminated (GW, LCCC status)
AR126 February 20152.142720121.920.10
AR211 September 20173.351120123.140.14
AR320 September 20195.771220120.000.28
AR47 July 202210.749220121.092.46
AR58 September 20233.709520120.120.24
AR63 September 20249.6513120120.162.47
AR710 February 202614.6720120240.000.00

AR7 in detail

AR7 ran in two parts: DESNZ published the AR7 results on 14 January 2026 and the AR7a results on 10 February 2026. AR7 awarded, in 2024 prices: offshore wind 8,245 MW at £90.91/MWh; solar PV 4,905 MW at £65.23/MWh; onshore wind 1,306 MW at £72.24/MWh; floating offshore wind 192 MW at £216.49/MWh; tidal stream 21 MW at £265.00/MWh. Delivery years run from 2027/28 to 2030/31.

Strike prices by round and technology

Each figure is the capacity-weighted strike price for that technology in that round. AR1–AR6 strike prices were set in 2012 prices; AR7 in 2024 prices. We convert between them with the DESNZ CPI factor (2012 = 2024 × 0.7177).

Capacity-weighted strike prices by round and technology
Round and technologyCapacity (MW)ProjectsStrike price (£/MWh, round price base)Price baseStrike price (£/MWh, 2024 prices)
AR1 · Offshore wind1,1622117.772012164.09
AR1 · Onshore wind7491582.042012114.31
AR1 · Energy from waste (with CHP)95280.002012111.47
AR1 · Solar PV72565.80201291.68
AR1 · Advanced conversion technology623117.582012163.83
AR2 · Offshore wind3,196362.14201286.58
AR2 · Dedicated biomass (with CHP)86274.752012104.15
AR2 · Advanced conversion technology64670.43201298.13
AR3 · Offshore wind5,466640.67201256.67
AR3 · Remote island wind275440.00201255.74
AR3 · Advanced conversion technology34240.01201255.74
AR4 · Offshore wind6,994537.35201252.04
AR4 · Solar PV2,2096645.99201264.08
AR4 · Onshore wind838942.47201259.18
AR4 · Remote island wind598646.39201264.64
AR4 · Tidal stream414178.542012248.77
AR4 · Floating offshore wind32187.302012121.64
AR4 · Energy from waste (with CHP)30145.99201264.08
AR5 · Solar PV1,9285647.00201265.49
AR5 · Onshore wind1,4812452.29201272.86
AR5 · Remote island wind224152.29201272.86
AR5 · Tidal stream5311198.002012275.88
AR5 · Geothermal123119.002012165.81
AR6 · Offshore wind4,942957.39201279.96
AR6 · Solar PV3,2889350.07201269.76
AR6 · Onshore wind9902250.90201270.92
AR6 · Floating offshore wind4001139.932012194.97
AR6 · Tidal stream286172.002012239.65
AR7 · Offshore wind8,2451090.91202490.91
AR7 · Solar PV4,90515765.23202465.23
AR7 · Onshore wind1,3062872.24202472.24
AR7 · Floating offshore wind1922216.492024216.49
AR7 · Tidal stream214265.002024265.00

Questions

What were the CfD AR7 results?

AR7 awarded 14.67 GW to 201 projects (DESNZ results; final results published 10 February 2026). By capacity: offshore wind 8,245 MW at £90.91/MWh; solar PV 4,905 MW at £65.23/MWh; onshore wind 1,306 MW at £72.24/MWh; floating offshore wind 192 MW at £216.49/MWh; tidal stream 21 MW at £265.00/MWh.

Which CfD allocation round awarded the most capacity?

AR7, with 14.67 GW across 201 projects.

How much capacity have CfD auctions awarded in total?

50.0 GW across 569 projects in AR1 to AR7, as offered at auction. The LCCC register today holds 55.5 GW across 612 contract units, including contracts outside the auctions.

Why are some strike prices in 2012 prices and others in 2024 prices?

AR1–AR6 strike prices were set in 2012 prices; AR7 in 2024 prices. We convert between them with the DESNZ CPI factor (2012 = 2024 × 0.7177).

What is the difference between auction results and the LCCC register?

Results = contracts offered at auction (DESNZ). Register = contracts on LCCC's register today, which drops offers not signed and later changes.

Sources

Figures are a snapshot of the latest published data and are rebuilt with every data refresh. Check primary sources before relying on any figure. Methodology & data use · Plans